Engineered treatment solutions · Equipment supply from China
ENVIRONMENTAL TECHNOLOGY & EQUIPMENT SUPPLY

Built for Better Water Treatment.

Wastewater treatment systems, sludge processing equipment and selected auxiliary equipment — supported by practical engineering experience and project-based technical evaluation.

2003Company founded
HBR · AOAS · FASTTechnology portfolio
Equipment + EngineeringProject-led supply
A wastewater treatment facility shown in Tianren company presentation
Applied experience in municipal & industrial treatment projects
Proprietary treatment technologiesIntegrated package supplyEquipment sourcing coordinationEngineering project references
PRODUCT PORTFOLIO

Equipment for the Whole Treatment Process

Start with your treatment objective. We combine company-developed process solutions with sourced equipment where a complete package is needed.

High-Speed Turbo Blowers — Tianren company presentation image
Auxiliary Equipment

High-Speed Turbo Blowers

The company presentation includes air-suspension and magnetic-suspension centrifugal blowers within its equipment sales section. Tianren can discuss projec...

Product details
TWO CAPABILITIES, ONE PROJECT TEAM

Core technology.
Connected supply.

Our approach separates the process technologies we develop from the supporting equipment we can specify and source for a project.

Core treatment technologiesHBR biofilm, AOAS-IFAS, FAST, sludge drying and flexible pressing concepts described in company materials.
Integrated equipment supplyTanks, blowers and selected mechanical/electrical components can be considered as part of a defined treatment package.

Product origin, manufacturing entity, performance guarantees and certification scope are stated in the quotation, not presumed for every item.

Explore Our Technology
AOAS wastewater treatment system field installationSludge drying equipment photographed in a project
FIELD EXPERIENCE

Technology Supported by Domestic Project References

Selected applications from the company presentation. They demonstrate project experience in China and are not represented as overseas installations.

Guang’an Township Wastewater Facilities project reference photograph
Decentralized wastewater

Guang’an Township Wastewater Facilities

22,000 m³/day

Reported total design capacity across the cited project facilities.

Bazhong Enyang Integrated Treatment Project project reference photograph
Packaged wastewater

Bazhong Enyang Integrated Treatment Project

5,300 m³/day

Project treatment capacity from company presentation.

Guiyang Longdongbao WWTP project reference photograph
Low-temperature sludge drying

Guiyang Longdongbao WWTP

50 t/day

Reported daily sludge treatment capacity for the referenced project.

HOW WE WORK

From Design Inputs to an Equipment Proposal

For engineered wastewater equipment, a useful quotation requires more than a capacity figure.

01

Understand the treatment duty

Review pollutant characteristics, flow variation, target effluent and site constraints.

02

Agree on the process and supply boundaries

Identify proprietary technology elements and sourced equipment, plus the owner of each interface.

03

Prepare a technical and commercial offer

Confirm drawings, equipment list, test basis, documentation and responsibilities before ordering.

GET STARTED

What to send with your first RFQ

  • Application and project country
  • Flow rate or sludge throughput
  • Influent analysis and discharge target
  • Site conditions and power supply
  • Supply scope, schedule and delivery terms