Engineered treatment solutions · Equipment supply from China
Home›Products›Low-Temperature Sludge Dryers
For sludge volume reduction

Low-Temperature Sludge Dryers

Heat-pump dehumidification and sludge drying at controlled low temperatures.

Tianren describes the collaborative development of a sludge low-temperature drying process operating around 45–50°C. In a closed-loop air system, moisture is removed from sludge and condensed through heat-pump dehumidification.

Supply modelCollaboratively developed process / equipment
Low-Temperature Sludge Dryers image from Tianren company presentation
Reference image · Final product configuration and equipment origin confirmed by quotation.
PRODUCT OVERVIEW

Why Consider This Solution?

Engineering features and potential use cases; actual results depend on the design basis.

  • Closed-loop low-temperature drying process described in source material.
  • Can be evaluated for municipal wastewater sludge treatment.
  • Supports downstream transport, disposal or resource-utilization planning.
  • Project reference: Guiyang Longdongbao wastewater treatment plant.
HOW IT WORKS

Working Principle

Conditioned dry air contacts the sludge and takes up moisture. The wet air is dehumidified and reheated for recirculation. Sludge properties, initial moisture, throughput and outlet moisture targets determine the design.

Detailed PFD/P&ID, performance curves and certified specifications are supplied only after product and project confirmation.

APPLICATIONS

Typical Applications

  • Municipal wastewater sludge
  • Centralized sludge treatment facilities
  • Selected industrial biological sludge after testing
  • Pre-disposal moisture reduction
PROPOSED SUPPLY SCOPE

What Can Be Included

  • Drying-process assessment and capacity selection
  • Drying machine and associated mechanical systems as agreed
  • Electrical, control and process integration
  • Installation / operation documentation agreed in contract

The equipment manufacturer of record, control of subcontracted items, scope boundaries and warranty allocation are documented in the final agreement.

TO SIZE & QUOTE

Required Project Data

Share these details to make initial equipment sizing and quotations more accurate.

  • Wet sludge throughput (t/day)
  • Inlet moisture content and sludge type
  • Desired outlet moisture and operating hours
  • Power supply, available space and planned disposal route
FREQUENT QUESTIONS

Technical FAQ

Will all sludge be dried from 80% to 10% moisture?

The 80%-to-10% figure is a potential capability described in the presentation, not a universal guarantee. Actual performance requires feed testing and specification confirmation.

What is the energy consumption?

The PPT does not establish a transferable kWh per tonne value. Request a project-specific guaranteed consumption estimate.

Can industrial sludge be processed?

Suitability depends on sludge characteristics, hazards and off-gas handling requirements.

RELATED EQUIPMENT

Explore Related Products

Systems are selected for the process, not sold as unrelated components.

High-Speed Turbo Blowers — Tianren company presentation image
Auxiliary Equipment

High-Speed Turbo Blowers

The company presentation includes air-suspension and magnetic-suspension centrifugal blowers within its equipment sales section. Tianren can discuss projec...

Product details